The aim was a simple, effective architectural solution for the needs set out. The plot is occupied by an existing building of about 200 m², leaving two free areas on either side. These two areas were chosen for the extension, with two modules whose geometry fits the available space.
The starting points for the project were:
• Make the most of the plot and the existing building.
• Keep the construction system of the standard technical buildings for the extension, with only the slight adaptations needed for the proposal.
• Keep the specifications of the standard technical buildings for the extension and for refitting the existing building.
• Lay out the spaces by function, grouping areas by use.
• Reduce routes and shared areas.
• Redistribute floor areas based on experience on other high-speed sections.
• Add rooms required for maintenance.
• Integrate the existing volume with the extensions, creating a unified image.
• Keep the access road on the side away from the track, so the building has two separate entrance areas.
• Keep work on the existing building to a minimum.
The materials are textured precast concrete and galvanised steel. Rooms are grouped by use. The westernmost piece holds the energy rooms, linked to one another and close to the public supply switching centre. The existing building, the central prism, holds the remaining technical rooms, keeping a corridor between its two rows of columns that connects the pieces. The easternmost piece contains all the maintenance rooms. In the existing building, the work consisted of stripping it back to its shell, renewing the services, reconfiguring the external openings to keep only those needed for precision air conditioning, and a facelift: removing existing elements (light fittings, grilles, metalwork…) and giving a surface treatment to the concrete block it is built with.