Moreno del Valle Arquitectos
ESMadrid
CRC Albacete

CRC Albacete

Transport · Built

Railway Regulation and Control Centre

Albacete

“Simple as doves, shrewd as serpents.” (Matthew 10:16)

The building stands out firmly on its site, a service area of the track yard next to Albacete railway station.

The response achieves presence without stridency, with discretion.

The building must not only accommodate a brief that combines all its uses; it also carries a strong symbolic load which, given its content and location, adds to the notable presence of the new station without competing with it.

It is made up of three distinct volumes: the Regulation and Control Room, the technical rooms, and the Safety and Civil Protection rooms, arranged around the entrance hall. The main and most representative volume, the largest, houses the Regulation and Control Room. The second holds the technical rooms proper and the third is for Safety and Civil Protection, all connected through the shared core with the entrance hall, toilets and staff changing rooms. This gives each block its own autonomy and has allowed the use of each one to be optimised.

Combining independent volumes also allowed each to be placed in its exact position in response to its immediate surroundings: the double-height block faces Track 9 of Albacete station and is the point of reference from all over it, while the single-storey blocks relate to the other technical buildings in the area and help order their setting.

Operators work continuously in several shifts, 24 hours a day, so the room had to offer optimum ergonomics, air conditioning and lighting. The Regulation Room is therefore a double-height space whose structure frees the floor by taking the columns to the perimeter, leaving it completely open, while the flat roof can still carry heavy machinery. The operators face the wall of visual display screens; offices, rest room and crisis room are arranged on two floors on the south side of the cube that forms the regulation room.

The materials are precast concrete and steel for the ventilated façade of perforated sheets, which filter the light inside the building.

Completed 49

Drawings 18